Gaps #86887
openGaps #86698: HUMS T.H.I.S GAP Analysis
Gaps #87377: GAPS > LAB > THIS
MIS Report: Statistic report for number of specimen received.
0%
Description
Description
This report provides the total number of specimens successfully received and recorded in the Central Receiving module within the selected reporting period.
The report summarizes specimen receipt volume by Unit, Department, and Source Type, grouped by month based on the Central Receiving Date.
Report Tittle: Specimen Receipt Statistics Report
| Filter | Control |
| Unit | Dropdown |
| Department | Multi-select Dropdown (Searchable) |
| Source Type | Multi-select Dropdown (Searchable) |
| From Month - To Month | Month/Year Picker |
| Group By | Fixed (Month) |
*The reporting period shall be determined based on the Central Receiving Date (the date the laboratory successfully received the specimen). Monthly counts displayed in the report are grouped according to this Central Receiving Date.
Validation:
1. Maximum date range allowed: 12 months.
2. Date selection is based on Central Receiving Date.
3. The system shall validate: from Month is earlier than or equal to To Month.
4. Selected period does not exceed 12 months.
Validation Message
Selected reporting period cannot exceed 12 months.
Output Grid:
| No | Department | Source Type | Jan-25 | Feb-25 | Mar-25 | Apr-25 | ... | Dec-25 | Total |
Sorting
Default sorting: Highest specimen count shall appear first.
Definition of Number of Specimens Received
Number of Specimens Received refers to the total number of specimens successfully received and recorded in the Central Receiving module within the selected date range and report criteria.
If a single request contains multiple specimens, each specimen shall be counted individually.
Exclusion Criteria
Cancelled or rejected specimen receipt records shall be excluded from the report.
Only successfully received specimens recorded in the Central Receiving module shall be counted.
Note:
Recollected Specimens
Recollected specimens that are assigned a new Specimen Number and successfully received in Central Receiving shall be counted as new specimens.
Expected Sample Report

Business Rules
1. One row represents a unique combination of:
Unit
Department
Source Type
2. All specimens received under the same Unit, Department and Source Type shall be aggregated into a single row.
3. Monthly columns shall be dynamically generated based on the selected reporting period.
4. A Total column shall be displayed as the cumulative count across all displayed months.
5. A Grand Total row shall be displayed at the bottom of the report.
6. Maximum reporting period allowed is 12 months.
7. Only specimens successfully received in Central Receiving shall be counted.
8. Cancelled specimen receipts shall not be counted.
9. Rejected specimen receipts shall not be counted.
10. Recollected specimens assigned with a new Specimen Number shall be counted as new specimens.
11. Default sorting shall be by Total Count in descending order.
12. The report grouping shall always be Month (fixed).
13. Monthly totals in the Grand Total row shall equal the sum of all displayed rows for the corresponding month.
14. The Total column shall equal the sum of all displayed monthly columns for that row.
Files
Updated by Sunil Shinde over 1 year ago
- Category changed from MedCare to M Laboratory
Updated by Vasuki Muniratnam about 1 year ago
- Subject changed from Statistic report for number of specimen received. to Statistic report for number of specimen received. (no info from client)
Updated by Kierthini Nethi 8 months ago
- Assignee changed from Saniati Latif to Zaldy Conrad Tungcap
- Priority changed from Normal to Critical
- Issue released on Prod added
- Function HUMS added
Updated by Vasuki Muniratnam 5 months ago
- File clipboard-202606100946-1ssyy.png clipboard-202606100946-1ssyy.png added
- Description updated (diff)
Updated by Daniyal Ansari 5 months ago
- Assignee changed from Daniyal Ansari to Shweta Bhoyar
Updated by Daniyal Ansari 4 months ago
- Dev Due date changed from 03/08/2026 to 05/08/2026
Updated by Daniyal Ansari 3 months ago
- Dev Due date changed from 05/08/2026 to 12/08/2026
- Release date to QA set to 13/08/2026
Updated by Daniyal Ansari 2 months ago
- Assignee changed from Shweta Bhoyar to Daniyal Ansari