Project

General

Profile

Actions

Gaps #87411

open

Gaps #86698: HUMS T.H.I.S GAP Analysis

Gaps #87123: GAPS > CSSD > THIS

CSSD Module – Equipment Test Run Option

Added by Anuj Barsaley about 1 year ago. Updated 8 months ago.

Status:
Assigned
Priority:
Normal
Category:
CliniCare
Target version:
-
Start date:
13/08/2025
Due date:
% Done:

20%

Estimated time:
Dev Due date:
Release date to QA:
Issue released on:
NA
Function:
HUMS

Description

1. Description:
The system must provide an option to initiate and record a test run for sterilization/disinfection equipment in CSSD (e.g., autoclaves, washer disinfectors, low-temperature sterilizers) as part of routine quality assurance and maintenance. The test run verifies that equipment is functioning correctly before processing instruments or sets.

2. Functional Requirements:
o Initiate Test Run:

 Provide a dedicated function/button in the CSSD module for “Equipment Test Run.”
 Accessible only to authorized CSSD staff based on role permissions.

3. Mandatory Details to Capture:

o Equipment Type (e.g., Autoclave, Washer Disinfector, Low-Temperature Sterilizer) – selected from master list.
o Machine Number (unique identifier for the specific equipment unit).
o Operator/User ID (auto-captured from login).
o Test Number or ID (e.g., Bowie-Dick Test, Leak Test, Performance Qualification Test).
o Date & Time of Execution (system-generated).

4. Test Results Entry:

o Pass/Fail selection (radio buttons or drop-down).
o Comments/Remarks field (free text, mandatory for Fail result).
o Follow-Up Action flag (checkbox or drop-down for types of follow-up, e.g., Repair Request, Retest Scheduled).

5. Post-Test Workflow:

o If Pass, equipment is marked as available for use.
o If Fail, system should:

 Mark equipment as “Unavailable” until cleared.
 Notify CSSD supervisor automatically.
 Log follow-up action details.

6. Data Logging & Audit:

o Store all test run records with user, date/time, and results for compliance and traceability.
o Maintain historical log for at least the regulatory minimum retention period.

7. Reports:

o Equipment Test Run Log (filter by date, equipment type, machine number, test type, result).
o Failed Test Summary Report with follow-up action status.

Actions #1

Updated by Shubham Ray about 1 year ago

  • Assignee changed from Shubham Ray to Jineesh M Joy
Actions #2

Updated by Shubham Ray about 1 year ago

  • Assignee changed from Jineesh M Joy to Sunil Shinde
Actions #3

Updated by Mohd Azmild Hamild 10 months ago

  • Status changed from New to Assigned
Actions #4

Updated by Kierthini Nethi 8 months ago

  • Assignee changed from Sunil Shinde to Daniyal Ansari
  • Issue released on NA added
  • Function HUMS added
Actions

Also available in: Atom PDF